Client: Leicestershire County Council Location: Leicester Value: £1.2 million

Design & Build

This is another HWRC undertaken for leicestershire County Council as part of G F Tomlinson’s involvement in the partnering framework for waste recycling and civils works. The facility will be used both by the trade and general public.

The public route has a typical highway construction of flexible surfacing on sub base founded on mainly site generated fills. The lower levels are constructed of reinforced concrete slabs, beneath which a new surface water drainage system, consisting of pipe work, interceptor, and rain water storage cells have been constructed. A new site operators office of traditional brickwork construction is situated at the upper level. Protection around the skip filling areas is provided by a combination of steel barriers and steel mesh fencing.

Contract Period: 24 weeks

The finished project has created a split level facility with a ramped circulatory route for public users and low level central area for service vehicles.

The site has been completed by a new security fence around the perimeter and landscaping to improve the final appearance.

WE BUILD ON OUR EXPERIENCE

Site Map Accessibilty Privacy Policy Equality and Diversity Policy
Anti Modern Slavery Statement Covid Procedures Carbon Reduction Plan Join Our Mailing List Find Us

Copyright © G F Tomlinson Group Ltd 2026